Rehabilitation and Extension of the bridge over the Ebro river in Gelsa

Project description

Partial demolition of the bridge deck of 1940. Rehabilitation of the arches. Integral use of batteries, stirrups and foundations. New continuous and mixed board with 2 CORTEN steel drawer beams and upper slab.

  • Tipology: Continuous beam. Mixed board.
  • Total length: 264 m
  • Width: 10,6 m
  • Major span: 52,8 m

Project data

  • Client: DG Carreteras. Gobierno de Aragón.
  • Year of project completion: 2019
  • Budget: 4.85 M€
  • Contract type: Project and Technical assistance to construction management.