Rehabilitation of the bridge over the Ebro River in Sástago

Project Description

The Sástago bridge was built in 1942 and is formed by 3 concret arch of 60+80+60 m, the total length is 200 m. Due to the partial rupture of the deck in the central arch it was repaired and all the hangers has been reinforced.

  • Structural typology: Concrete half-through arch
  • Total length: 200 m
  • Major span: 80 m
  • Width: 9.5 m

Project data

  • Client: DG Carreteras. Gobierno de Aragón.
  • Works end: 2020
  • Budget: 0.46 M€
  • Work done: Project + Technical assistance to construction management.