Railroad bridges in Vila-Seca

Project description

The deck and the arch were built out its final position and put in place in one night, by sliding it, by horizontal movement powered by hydraulic jacks.

  • Structural type: Steel arch and prestressed concrete deck
  • Total length: 42,2 m
  • Major span: 42,2 m

Project data

  • Client: Infraestructures de la Generalitat de Catalunya
  • End of construction: 2013
  • Budget: 2,7 M€
  • Works done: Project and construction management
  • Awards: Beyond Building Construmat 2.015. Civil Engineering. Mention