Breakwater repair Marina Port d’Aro. Strom Januray 2008

Project description

On late January 2008 a storm severely damaged the main breakwater of Marina Port d’Aro. A project was drawn up for its repair and reinforcement. After detailed studies, it was decided to carry out a reinforcement of the armour layer with 33T weight concrete cubes and a modification of the breakwater’s profile in order to improve its stability.

33 T weight concrete cubes

Project data

  • Client: Club Nàutic Port d’Aro. Servei de Ports i Costes, Generalitat de Catalunya
  • Year of project completion: 2009
  • Budget: 1.2 M€
  • Contract type: Detailed design and construction management.