Sant Andreu Footbridges

Project description

The two footbridges set up the crossing over the railways in Barcelona’s district Sant Andreu. The structure connects an important communication axis for the district that was historically divided by the railway tracks. These footbridges will last until the works of the new train station was finished, after that both footbridges will be moved away.

Structure details
  • Structural type: Steel beams
  • Total length: 40 m + 53 m
  • Major span: 40m
  • Wide: 3 m
Situation

Project data

  • Client: Barcelona Sagrera Alta Velocitat. Ajuntament de Barcelona. ADIF.
  • end of construction: 2015
  • Budget: 370.000 €
  • Works done: Project and works direction

If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this. More information

La configuració de les galetes d'aquesta web està definida com a "permet galetes" per poder oferir-te una millor experiència de navegació. Si continues utilitzant aquest lloc web sense canviar la configuració de galetes o bé cliques a "Acceptar" entendrem que hi estàs d'acord.

Tanca