Two parallel bridges over the railway corridor of St. Andreu-Sagrera. Spans: North bridge: 12+73.9+73.8+13.6 m, South bridge: 12+66.1+73.7+13.6 m. Very fast construction: December 1999 – May 2000.

  • Structural type: Steel + concrete composite beam
  • Total length: 338.7 m
  • Major span: 73.9 m

Project data

  • Client: Barcelona Regional, Barcelona City Council
  • End of construction: 2000
  • Budget: 5.3 M€
  • Works done: Project and construction management