Olympic swimming pools Bernat Picornell

Project description

Roof structure, pools and new buildings of the complex. The cover, a spatial mesh tube, is suspended three metal frames. The roof unifies two pre-existing buildings and, between them, there is a new pool indoor. Action of Manuel Reventós before the foundation of the company.

  • Structural type: Steel frames + spatial truss, concrete swimming pools
  • Total surface: 10.200 m2

Project data

  • Client: COOB’92, Barcelona City Council
  • End of construction: 1991
  • Budget: 6 M€
  • Works done: Conceptual design, structure design and works direction