Old Bridge and surroundings in Montblanc

Project Description

Emergency action due to the flood in October 2019. Reconstruction of the medieval bridge over the Francolí River andaptetion of its surroundings.

  • Structural type: Multiple stone arches
  • Total length: 45 m
  • Major span: 12 m
  • Surface: 1,05 ha

Project data

  • Client: Montblanc Council
  • End of construction: expected 2022
  • Budget: 1,55 M€
  • Works done: Project and Works direction