Lleida Station Footbridge

Project description

Footbridge over the tracks of the station of Lleida. 52 m maximum span in the part on metal lattice. Total prefabrication. It is a genuine Gimkhama between the stacks of the new station cover. Concrete platforms and wood.

  • Structural type: Metal truss Warren amd cocrete slabs.
  • Major span: 52 m

Projecte data

  • Client: Ajuntament de Lleida. ADIF.
  • End of construction: 2003
  • Budget: 0,88 M€
  • Works done: Projecte.