Footbrige La Farigola

Project description

The deck is suspended from two horizontal steel girders. Between these two elements there are a stainless steel mesh used as a safety fence. There are stairs and an elevator to access to the footbridge and the platform that acts as a viewpoint to the new park.

  • Structural type: Steel frame
  • Total length: 64.8 m
  • Major span: 36.8 m
  • Finishes: Wood pavement

Project data

  • Client: Area Metropolitana de Barcelona. Cerdanyola del Vallés City Council
  • End of construction: 2013
  • Budget: 750.000 €
  • Works done: Project and construction management