Port equipment in the Cambrils Harbour

Project Description

Marina Cambrils was born from the desire to create a space for nautical activity integrated into its immediate surroundings. It is proposed through the construction of a marina consisting of two floating pontoons and a fixed platform located at dock level, which will become the nerve center of the facility, on which are located the different service booths (offices, toilets, warehouse) and equipment necessary to operate the facility.

Type: Floating pontoons and fingers.

Surface area: 1.815 m2

Moorings: 36 boats (lengths from 7.5 to 15 m).

Technical networks: Water, Electricity, Sanitation and Telecommunications.

Project data

Client: Be Charter Boats S.L.

Completion: 2021

Budget: 0,50 M€.

Works done: Construction Project and Construction Management.