Camp de la Bota Footbridge

Project description

Connection between the neighborhood of La Mina / New Campus UPC and Port Forum. Cable-stayed footbridge and squares arrival. Monument to the  Republicans  executed in the Camp de la Bota.

  • Footbridge tipology: Cable-stayed
  • Major span: 94 m
  • Wide: 6 m
  • Total length: 200 m
  • Squares surfaces: 1.8 ha

Project data

  • Client: Consorci del Besòs. St. Adrà del Besòs City Council
  • End Study: 2015
  • Budget: 6 M€
  • Works done: Informative study