Rehabilitation and widening of the sidewalks of the Sant Francesc Bridge

Descritption of the project

The purpose of the project of the Rehabilitation of the Pont de Sant Francesc is the definition, justification and assessment of the necessary works for the rehabilitation, repair and improvement of the pathologies of the Pont de Sant Francesc over the Cardener river, viaduct of the C-37z road at PK 93+090.
The project also contemplates the widening of the sidewalks to improve the conditions of the pedestrian itinerary.

  • Tipology: Masonry bridge with 5 arches
  • Total length: 80 m
  • Main span: 16 m

Project data

  • Client: Infraestructures de la Generalitat
  • Budget: 0,023 M€
  • Works done: Technical assistance in the drafting of the project.