Footbridge Raval de la Mar

Project description

Footbridge over A-7 motorway near the thematic park “Port Aventura”. Spans: 24.5+34+38+56+38+32+24.5 m. Triangular section. Concrete Ionic piles.
Pictures from Paco Perez.

Structure details
  • Structural type: Steel + concrete composite beam
  • Total length: 281 m
  • Major span: 56 m
Situation

Project data

  • Client: Infraestructures de la Generalitat de Catalunya
  • End of construction: 2013
  • Budget: 2.1 M€
  • Works done: Project and construction management
  • Awards: Beyond Building Construmat 2015. Mention