Fartet Bridge

Project description

The “Fartet” (“little fed up” in literal translation) is a brackish water fish endangered. The channel protects their habitat. It is a bridge with minimalist Zen influences to adapt to the horizontal lines of the Delta of the river Ebre.

  • Structural type: Steel beams, steel + concrete composite deck
  • Span: 25 m

Project data

  • Client: Marina Sant Carles, SA, Ports de la Generalitat de Catalunya
  • End of construction: 2008
  • Budget: 300.000 €
  • Works done: Design and works direction