Beaches regeneration Sitges

Project description

Dredging operations in Port Ginesta and Port Aiguadolç for the maintenance of safety drafts. The dredged sand was used for beach nourishments. It was transported and dumped on the following beaches: Sant Sebastià de la Bassa Rodonona, l’Estanyol and Riera Xica, all of them located in Sitges.

Dredging volume: 45.000 m3

Project data

  • Owner: DRAG-SUR. Sitges City Council
  • End of works: 2014-2018
  • Budget: 0,25 M€
  • Works done: Project and works direction

Privacy Preference Center

Obligatory

They are used to guarantee the correct functioning of the web.

gdpr, pll_language

Statistics

Statistics

They help us analyze and improve the interaction of users with our website by collecting information anonymously

_ga, _gid

Other