Daió Footbridge

Project description

Trippers path  in the Núria Natural Park. Built with local media.

Structure details
  • Footbridge tipology: Wooden truss
  • Length/Span: 18 m
  • Wide: 1,5 m
Situation

Project data

  • Client: Hidrogest. Hidrodata
  • End construction: 1998
  • Budget: 15.000 €
  • Works done: Project and works direction