Marina. Sant Carles de la Ràpita Harbour

Project description

Construction of a new marina, located in the Ebre river Delta. 1.110 moorings to be used by boats up to 30 m length. A 30.000 m² land for the main services of the users. Boatyard of 11.000 m². The west part was built by using floating pontoons and fingers, and the east part with concrete structures. New swimming pool and a garden, with a landscape treatment. Restoration of a harbour degraded area by soil contamination. Special environment care for the Ebre delta natural park

Details
  • New inner docks 
  • Moorings: 1.110
  • Typology: Floating pontoons
  • Total surface: 23 ha
Situation

Project data

  • Client: Marina Sant Carles, SA, Ports de la Generalitat de Catalunya
  • End of construction: 2009
  • Budget: 20 M€
  • Works done: Construction design and works direction