Port d’Aro Marina

Project description

The concession of Marina Port d’Aro expired in 2017. The managers of the port comissioned us to make the base proposals for the public tender and, after winning this, the drafting of the improvement project. The major actions are: modification of the mouth of the harbour by extending the main breakwater, new protection characteristics (blocks X_T) and construction of a new outer seawall, in order to reduce agitation in the inner side of the harbor and increase its protection; dredging of the inner area of the harbour; reorganitation of the fleet and increase of the navigation channels; rearrangement of the existing quays, renewal of service networks, anchoring and paving, small buildings and urban improvements (parking, road access and a section of the promenade). Tests were performed in a wave basin.

Details
  • Surface: 12,7 ha
  • Land spaces: 4,7 ha
  • Mirror water: 8 ha
  • Moorings: 526
  • Surface Moorings: 25.890 m2
  • Sewall: 260m
Situation

Project data

  • Client: Club Nàutic Port d’Aro. Servei de Ports de la Generalitat de Catalunya.
  • Budget: 26,4 M€
  • Works done: Competition for the administrative concession and project.