Footbridge Cappont

Project description

Footbridge and square on the river Segre. Spans: 24.8+56+56+24.8 m. First structure built in Spain with large volume of concrete 60 MPa “in situ”.

Other Awards: II Bienal Iberoamericana Arquitectura y Urbanismo 2000. México. Selection.

Structure details
  • Structural type: Pretressed concrete beam
  • Total length: 161.6 m
  • Major span: 56 m
  • Wide: 7 m
  • Square: 1200 m²
Situation

Project data

  • Client: Lleida City Council
  • End of construction: 1997
  • Budget: 780.000 €
  • Works done: Project and construction management
  • Awards: FAD 1998, Outdoor spaces. Selection