Les Cremades Bridge and restoration of Romanesque Bridge

Project description

Asymmetrical bridge next to a Romanesque stone bridge which is replaced. Rehabilitation and restoration of the Romanesque bridge and continuation of the promenades of stream until the Romanesque bridge. Restoratiom of the Medieval Wall.

Structure details
  • Structural type: Steel + concrete composite beam.
  • Total length: 40 m
  • Major span: 31.6 m
Situation

Project data

  • Client: Caldes de Montbui City Council
  • Budget1.36 M€
  • Works done: Project and construction management